Class 1 through 4
The class of loss describes how much water the materials absorbed. It sets how many air movers and dehumidifiers a room needs and how long they run.
Estimate how long a Sacramento water loss takes to dry. The window depends on the class of loss, the water source, the season and how soon drying started.
(888) 774-9605Ask how long your rooms needPick the closest answers. Real drying ends when the readings say so, not on a set date.
Pick your answers to see a typical drying window.
Estimate only, not a quote. The real scope comes from a walkthrough and a moisture map.
(888) 774-9605Drying questions answered 24/7The class of loss describes how much water the materials absorbed. It sets how many air movers and dehumidifiers a room needs and how long they run.
Hot, dry summers help evaporation, while cool, wet winter weeks slow it. LGR dehumidifiers dry the air inside the work area so materials keep giving up water.
IICRC S500 is the industry drying standard. Wet materials are dried until they read within 2 to 4 points of a dry reference material in the same home.
More on the equipment and readings on the structural drying page.
Framing, subfloor and drywall hold water after surfaces feel dry. Readings decide, so equipment stays until materials match the dry reference.
Cool, damp air pulls less water out of wet materials. LGR dehumidifiers dry the air inside the containment so evaporation keeps going.
Concrete is dense and releases water slowly. After a slab leak it often needs desiccant or LGR dehumidifiers and more days than drywall or carpet.
Yes. Water that sits soaks deeper, and contaminated water adds removal and cleaning before drying even starts.
A contained Class 1 loss usually dries in three to five days when drying starts quickly. Bigger and denser losses take longer.
Drying time shrinks when extraction and equipment start early. The drying team sets up as soon as it is called.
(888) 774-9605Get air movers running tonight